Transporting Green Energy Infrastructure Around the World

Case Studies

OIA Global worked closely with several renewable energy wind factories to transport different types of components, including blade molds and other raw materials. To facilitate such complex movements, different operations teams maintained direct contact with the factories’ logistics, procurement, and fulfillment teams throughout the journey.

Challenges

OIA’s customer had to move 100 tons of green energy equipment by air within 30 days! The items were needed for a new blade construction project and required transportation amidst peak season.

  • High freight costs during China’s outbound peak season: air standard (splits) and air charter costs were between USD $450K and 750K.

Solutions

OIA’s personnel coordinated inbound shipments from suppliers and their factories before moving the green energy items to different sites around the world. OIA conceived a sprint dock-to-dock solution via Full Container Load (FCL) ocean freight, with guaranteed services for 6 x 20’ general-purpose containers, all within 25 days.

Green Energy Components Transported

  • HUBs
  • Bed plates
  • Gearboxes
  • Generator frames
  • Pitch and yaw bearings
  • C-Class components

The customer saved 4.5x-7x in total freight costs as compared to standard air charters. The customer was spending $450K-$700K on air freight services and reduced their total transportation costs to around $100K when using OIA's solution.

Working with renewable energy systems?

Alternative energy sources often require complex logistics solutions.